What to include in a plumbing work order
- A work order number, the date and the scheduled date
- Customer name, job address and site contact
- A numbered list of the tasks to be done
- Materials and equipment needed, if known
- Access, safety and site notes the crew should know
- A completion and sign-off line for the customer
Specific to plumbing work
- The fixtures or equipment being installed or replaced, with size or model where known
- Water shut-off and any planned interruption to the customer's supply
- Permit and inspection requirements, where your area requires them
- Disposal or removal of old fixtures and materials
- A note that concealed pipe condition behind walls or floors can change the scope
What the finished work order looks like
A work order tells the crew what to do and records that it was done. Notice there are no prices: it is an instruction sheet.
Sample job: Replace a 40-gallon gas water heater. The rough notes behind it were:
- swap 40 gal gas heater in garage
- new expansion tank, flex lines, shut-off
- haul away old unit
- customer clears the garage
Sample Plumbing Co.
Work Order
Replace a 40-gallon gas water heater
| Description | Qty |
|---|---|
| 40-gallon gas water heater | 1 |
| Expansion tank | 1 |
| Flex lines and valves | 1 |
| Labor (hours) | 4 |
| Haul-away and disposal | 1 |
Clear access to the garage. Existing venting can be reused.
What to notice
- A clear, numbered list of tasks
- Site and access notes for the crew
- A completion line the customer signs
Plumbing tips for writing a work order
- Say whether the heater price includes the unit's warranty registration, if that is part of what you do.
- Note the shut-off time so the customer knows when they will be without hot water.
- List old-unit disposal as its own line so it is not mistaken for a hidden fee.
- If a permit is required where you work, show who pulls it and who pays.
Example job notes
Rough bullets are enough. This is the kind of input Automately AI turns into a finished document.
- Replace 40 gal gas water heater in garage - Haul away and dispose of old unit - New expansion tank, flex lines and shut-off valve - Customer to clear access to garage
Common mistakes that cost jobs
- A vague scope, so the customer assumes more is included than you priced
- No exclusions, which invites arguments about extras
- No validity date, so old prices get held against you
- Missing payment terms or deposit, which delays getting paid
- Mixing labor and materials in one number, which hides what the customer is paying for
Frequently asked questions
What is the difference between a work order and an invoice?
A work order instructs and records the work to be done. An invoice asks for payment once the work is finished. Many contractors send both for the same job.
Does a work order need prices?
Not always. You can leave prices at zero to use it as an internal job sheet, or include them if the customer should see the cost.
Who signs a work order?
Usually the customer signs on completion to confirm the work was done. Check local requirements if you are unsure.
Can I use this for plumbing work?
Yes. The wording is tuned for plumbing jobs, and you can edit every line before you download.
Should I list the water heater model on a plumbing document?
Yes, when you know it. Naming the model and size removes doubt about what was installed and makes warranty claims easier.
How do I handle a leak found behind the old unit?
Say in the assumptions that concealed damage may need a written change order, and then raise one before fixing it.
More work order templates
Not your trade? Start with the general work order template.
More for plumbing businesses
Add your branding to every PDF
Founding member pricing: join now and keep today's price for as long as you stay subscribed. Prices will rise for new members later.
Free
Try it on a real job
$0
- 3 AI documents per day
- Unlimited previews and edits
- PDF download with an Automately AI footer
- All trades and document types
Pro
For working contractors
$90 / year
$7.50 a month, billed yearly
- Everything in Free
- Clean PDFs with no Automately AI footer
- Send documents to customers by email or link, with online acceptance and payment reminders
- Up to 100 AI documents per day
- Manage or cancel any time
Max
For busy crews and growing firms
$190 / year
$15.83 a month, billed yearly
- Everything in Pro
- Our most capable AI model for richer, more polished wording
- Up to 300 AI documents per day
- Suited to proposals on larger jobs
7-day free trial, then billed at the price shown. Secure checkout by Lemon Squeezy, which also handles sales tax. Cancel any time from your billing portal.