What to include in a plumbing proposal
- A short summary of the problem and your recommended solution
- A detailed scope of work
- What is included and what is explicitly excluded
- Assumptions, such as access and existing conditions
- The price, any deposit, and how you want to be paid
- How long the proposal is valid and how the customer accepts it
Specific to plumbing work
- The fixtures or equipment being installed or replaced, with size or model where known
- Water shut-off and any planned interruption to the customer's supply
- Permit and inspection requirements, where your area requires them
- Disposal or removal of old fixtures and materials
- A note that concealed pipe condition behind walls or floors can change the scope
What the finished proposal looks like
A proposal explains the problem, your approach and the price. Notice how the scope and inclusions read compared with a plain price list.
Sample job: Replace a 40-gallon gas water heater. The rough notes behind it were:
- swap 40 gal gas heater in garage
- new expansion tank, flex lines, shut-off
- haul away old unit
- customer clears the garage
Sample Plumbing Co.
Proposal
Replace a 40-gallon gas water heater
| Description | Qty | Amount |
|---|---|---|
| 40-gallon gas water heater | 1 | $780.00 |
| Expansion tank | 1 | $95.00 |
| Flex lines and valves | 1 | $60.00 |
| Labor (hours) | 4 | $380.00 |
| Haul-away and disposal | 1 | $45.00 |
Clear access to the garage. Existing venting can be reused.
What to notice
- A short summary of the problem and the proposed solution
- Inclusions, exclusions and assumptions are explicit
- Acceptance is a clear, separate step
Typically left out of this job
- Repairs to the gas line or venting
- Drywall or paint repairs
Plumbing tips for writing a proposal
- Say whether the heater price includes the unit's warranty registration, if that is part of what you do.
- Note the shut-off time so the customer knows when they will be without hot water.
- List old-unit disposal as its own line so it is not mistaken for a hidden fee.
- If a permit is required where you work, show who pulls it and who pays.
Example job notes
Rough bullets are enough. This is the kind of input Automately AI turns into a finished document.
- Replace 40 gal gas water heater in garage - Haul away and dispose of old unit - New expansion tank, flex lines and shut-off valve - Customer to clear access to garage
Common mistakes that cost jobs
- A vague scope, so the customer assumes more is included than you priced
- No exclusions, which invites arguments about extras
- No validity date, so old prices get held against you
- Missing payment terms or deposit, which delays getting paid
- Mixing labor and materials in one number, which hides what the customer is paying for
Frequently asked questions
What is the difference between a proposal and an estimate?
An estimate is mainly about price. A proposal also explains your approach, scope, exclusions and assumptions, which helps on larger or less obvious jobs.
How long should a proposal be?
As long as it needs to be to remove doubt: usually one or two pages for typical residential work.
Can the AI make up details?
It is told to use only what you provide and to leave placeholders for anything missing. Always read and edit before you send.
Can I use this for plumbing work?
Yes. The wording is tuned for plumbing jobs, and you can edit every line before you download.
Should I list the water heater model on a plumbing document?
Yes, when you know it. Naming the model and size removes doubt about what was installed and makes warranty claims easier.
How do I handle a leak found behind the old unit?
Say in the assumptions that concealed damage may need a written change order, and then raise one before fixing it.
More proposal templates
Not your trade? Start with the general contractor proposal template.
More for plumbing businesses
Add your branding to every PDF
Founding member pricing: join now and keep today's price for as long as you stay subscribed. Prices will rise for new members later.
Free
Try it on a real job
$0
- 3 AI documents per day
- Unlimited previews and edits
- PDF download with an Automately AI footer
- All trades and document types
Pro
For working contractors
$90 / year
$7.50 a month, billed yearly
- Everything in Free
- Clean PDFs with no Automately AI footer
- Send documents to customers by email or link, with online acceptance and payment reminders
- Up to 100 AI documents per day
- Manage or cancel any time
Max
For busy crews and growing firms
$190 / year
$15.83 a month, billed yearly
- Everything in Pro
- Our most capable AI model for richer, more polished wording
- Up to 300 AI documents per day
- Suited to proposals on larger jobs
7-day free trial, then billed at the price shown. Secure checkout by Lemon Squeezy, which also handles sales tax. Cancel any time from your billing portal.