What Is a Change Order? A Contractor's Guide
By the Automately AI team. Last updated .
Most disputes on a job start with extra work nobody wrote down. A change order is the simple fix: a short document that records a change and gets the customer's approval before you do the work.
What a change order is
A change order is a written record of a change to the agreed scope, price or schedule. It amends the original estimate, proposal or contract rather than replacing it.
When you need one
- The customer asks for something outside the agreed scope
- You find a hidden condition, such as damaged framing, old wiring or corroded pipes
- Materials or specifications change from what was agreed
- The schedule changes because of the customer or a third party
What to put in a change order
- A reference to the original agreement
- A clear description of the change and the reason for it
- The effect on price, and on schedule if relevant
- A statement that the changed work starts only after written approval
- A signature line for the customer and the date
Make it a habit
Write the change order before you start the extra work, not afterwards. A one-page document, signed on site from your phone, is far better than trying to remember what was agreed.
Build it in minutes
Free to preview and edit. Add your job notes and Automately AI writes the document.
Frequently asked questions
Does every change need a change order?
Anything that affects price, scope or schedule should be recorded. Tiny adjustments may not need one, but when in doubt, write it down.
Can the customer refuse a change order?
Yes. If they decline, you do the original scope only. That is why you ask before doing the extra work.
Is a signed change order legally enforceable?
That depends on where you work and your original agreement. This guide is not legal advice, so check with a qualified professional if the stakes are high.